Egghead Metalwork Installation - Part 1

Boy oh Boy. Installing a project in Manhattan on Saturday Thanksgiving holiday weekend. Traffic lines are short and parking is abundant! Here is a heavy duty steel counter that will be topped with a slab of terrazzo.

Ledge Detail without Terrazo

Ledge Detail without Terrazo

FullSizeRender.jpg

Completed installation of Egghead Ledge Counter metalwork. 

IMG_4407.JPG

Steel leg detail. Completed installation of Egghead Ledge Counter metalwork.   

FullSizeRender.jpg

Lower footrest detail at base of center steel leg. Completed installation of Egghead Ledge Counter metalwork.

FullSizeRender.jpg

Steel leg detail at entrance. Egghead Ledge Counter metalwork. 

IMG_4399.JPG

Guido McCloud installing the anchors after drilling through the tile. Installation of Egghead Ledge Counter metalwork.